LOCHPLACE BUILDING CONSERVATION

COR CASTLE INNISHANNON

Co CORK

TEL: + 353 21 477 6677 - FAX: + 353 21 477 6063

VAT REG No: 951 3233M

LOCHPLACE LTD. COMPANY NUMBER 3163828


NON-HYDRAULIC RANGE 9

COURSE STUFF FOR GAUGING

DATA SHEET


DESCRIPTION

Course Stuff for Gauging is mixed in the ratio of 6:1, sand to lime using our standard Lime Putty slaked at our works. This mix is for gauging with hydraulic lines or gypsum plasters.

USES

In areas where there is considerable moisture or where early protection from frost may be needed.

SHELF LIFE

Matures with age and as long as it is kept in a sealed container or bags there is no upper time limit.

AVAILABILITY

Ex stock.

COVERAGE
HEALTH & SAFETY

Alkali ph 13, skin, eyes and open sores must be protected.

OBSERVATIONS

The success of lime based mortars or plasters depends greatly on the tradesman being familiar with them and understanding how gauging with different products can change their performance. Careful control of drying and protection from frost and excessive heat is very important.